Error no. Explanation
Inverter behavior
Corrective measures
S1
S2
R
1301
Left-hand rotating magnetic field is
connected.
30 s
Q
‒
• Check phase position.
• Make sure all fuses are switched on.
1500
The conditions for grid reconnec-
tion have not yet been reached af-
ter a grid error.
W
W
‒
• Check the power frequency and grid
voltage.
* Depending on the parameterization, the disturbance message may have to be acknowledged manually.
9.3.4.4
Error Numbers 34xx to 40xx - Disturbance on the PV Array
Error no. Explanation
Inverter behavior
Corrective measures
S1
S2
R
3403
PV array voltage is too high.
15
min
30
min
‒
• Check the DC voltage.
• Check the module wiring and system
design.
3404
Open-circuit voltage is too high.
Disturbance detected by standard
monitoring.
15
min
30
min
‒
3406
DC voltage is too high.
15
min
30
min
‒
3501
The insulation monitoring device
has measured a too low ground-
ing resistance.
C
C
‒
• Check the PV array for ground faults.
3502
The GFDI has tripped.
C
C
‒
• Check the PV array for ground faults.
3504
The insulation monitoring device
has detected an insulation error.
If the parameter
IsoErrIgn
is set to
On
, this error is ignored.
W
W
‒
• Check the PV array for ground faults.
3507
A ground fault has occurred on
the ungrounded terminal of the PV
array.
Q
Q
‒
• Check the PV array for ground faults.
3510
The inverter has detected an insu-
lation error on the inverter bridge.
Q
Q
‒
• Check the PV array for ground faults.
3511
The inverter has detected an insu-
lation error.
W
W
‒
• Check the PV array for ground faults.
3512
The Remote GFDI has detected a
permanent ground fault.
Q
Q
‒
• Check the PV array for ground faults.
3515
A ground fault detected by
Soft Grounding has been ignored.
W
W
‒
• Check the PV array for ground faults.
3517
Insulation measuring is being per-
formed.
W
W
‒
‒
9 Troubleshooting
SMA Solar Technology AG
System Manual
125
MVPS22JP-SH-en-11
Summary of Contents for 1000-1SC
Page 257: ......