5. Switch the inverter to
Start
.
6. Open the doors of the interface cabinet.
7. Check whether the DC load-break switch is switched on and indicating the position
On
.
If the DC load-break switch is not switched on or not indicating the position
On
8. Switch the inverter to
Stop
.
9. Test the switching process three times.
10. Close the doors of the interface cabinet.
10 Maintenance
SMA Solar Technology AG
System Manual
157
MVPS22JP-SH-en-11
Summary of Contents for 1000-1SC
Page 257: ......