Figure 27: Position of the support feet
Requirements:
☐ The requirements for the foundation must be complied with (see "Information on Transport and Mounting of the
MV Power Station").
☐ The pea gravel ground and the mounting option must be prepared (see "Information on Transport and Mounting
of the MV Power Station").
☐ The support feet must be attached to the MV Power Station (see Section 4.6, page 43).
☐ The length of the support feet on the MV Power Station must be at least 350 mm.
Risk of injury due to inappropriate transport of the oil tray
The oil tray for the MV Power Station is very heavy. If you try to move the oil tray without auxiliary equipment, you
may suffer injury.
• Only transport the oil tray using a suitable means of transport.
• Using a suitable means of transport, transport the oil tray as close to the ground as possible.
Risk of injury if heavy service platforms are lowered too fast
The service platforms of the MV Power Station are very heavy. If service platforms are folded down too fast or
dropped, persons could be injured.
• Have at least two people pull each service platform forwards and down.
• Always wear suitable protective equipment.
Damage to oil tray due to water undermining
In case of strong rain, the oil tray can be undermined and float away.
• Secure the oil tray against floating away.
Position of the cables when mounting the MV Power Station
To prevent damage to the previously laid cables during mounting of the MV Power Station, the cables must be
laid on the foundation as flat as possible.
4 Transport and Mounting
SMA Solar Technology AG