SMA America, LLC
5 Mounting
Installation Manual
CU600-1000US-IA-en-10
23
5.2 Mounting the Connection Unit on a Wall
Additionally required mounting material (not included in the scope of delivery):
☐ At least two screws that are suitable for the foundation
☐ At least two washers that are suitable for the screws
☐ At least two screw anchors that are suitable for the foundation and for the screws
Procedure:
1. Position the Connection Unit on the wall.
3. Mark the drill hole positions by means of the oblong holes in the brackets of the Connection
Unit. Use at least one of the oblong holes at the top and at the bottom.
4. Remove the Connection Unit from the wall.
5. Drill holes at the markings.
6. Insert suitable screw anchors into the drill holes.
Damage to the Connection Unit due to moisture and dust intrusion
Dust or moisture intrusion can damage the Connection Unit.
• Only mount the Connection Unit with its lid closed and with inserted filler plugs.
Risk of burns due to hot enclosure parts
Some parts of the enclosure can get hot during operation.
• Mount the Connection Unit in such a way that it cannot be touched inadvertently.
Risk of injury when lifting the Connection Unit, or if it is dropped
There is a risk of injury if the Connection Unit is lifted incorrectly or dropped during transport or
mounting
• Keep in mind that the Connection Unit weighs 22 lbs. (10 kg) when mounting it.
• Use suitable mounting material for the mounting location of the Connection Unit.
– Do not use hollow-wall anchors or toggle bolts for mounting on drywall.
2.
Danger of electric shock if electric cables and other supply lines are damaged by
drilling
• Before drilling, ensure that there are no electric cables and supply lines in the wall that
could be damaged.
The PowerStore Inc.
(888) 244-2979
12621 E FM 917 Suite A Alvarado, Tx 76009