Installation Manual
SMC9-11TLRP-IA-en-51
27
SMA Solar Technology AG
5 Mounting
Observe recommended clearances:
• Observe the recommended clearances to the walls as well as to other inverters or objects.
This ensures adequate heat dissipation and sufficient space to remove the ESS.
• If multiple inverters are mounted in areas with high ambient temperatures, increase the
clearances between the inverters and ensure an adequate fresh-air supply.
☑ This prevents a reduction in inverter power as a result of high temperatures (details on
temperature derating can be found in the Technical Information "Temperature Derating" at
www.SMA-Solar.com).
Observe the permitted mounting position:
• Mount the inverter in a permitted mounting position. The display should be mounted at eye level.
☑ Mounting the inverter in a permissible position will ensure that no moisture can enter.
☑ By mounting the device at eye level, display messages and LED signals can be read without
difficulty.
Figure 9:
Recommended clearances
Figure 10:
Permitted and prohibited mounting positions
Summary of Contents for 10000TL
Page 2: ......
Page 6: ...Table of Contents SMA Solar Technology AG 6 SMC9 11TLRP IA en 51 Installation Manual ...
Page 94: ......
Page 95: ......