42
SMC9-11TLRP-IA-en-51
Installation Manual
6 Electrical Connection
SMA Solar Technology AG
7. Ensure that all DC connectors are securely in place.
8. Check the ESS for wear (see section 10.6).
6.
Damage to the inverter due to moisture penetration
The inverter is only properly sealed when all the unused DC inputs are closed with DC
connectors and sealing plugs.
•
DO NOT
insert the sealing plugs
DIRECTLY
into the DC inputs on the inverter.
• For unused DC connectors, push down the
clamping bracket and push the swivel nut up to
the thread.
• Insert the sealing plug into the DC connector.
• Tighten the DC connector (torque: 2 Nm).
• Insert the DC connectors with sealing plugs
into the corresponding DC inputs on the
inverter.
☑ The DC connectors click audibly into place.
+
1
2
+
+
Summary of Contents for 10000TL
Page 2: ......
Page 6: ...Table of Contents SMA Solar Technology AG 6 SMC9 11TLRP IA en 51 Installation Manual ...
Page 94: ......
Page 95: ......