Activating and Deactivating the Backup System
SMA Solar Technology AG
92
SBU2200-TEN083320
Technical Description
Starting the Backup System with the Sunny Remote Control 1
1. Insert the NH fuse into the BatFuse A.01(see „Inserting the NH Fuse“ (80)).
2. Push the DC start button on the Sunny Backup 2200.
The Sunny Backup 2200 turns on.
3. The Sunny Backup 2200 initiates the startup phase.
Wait for the following displays.
4. As soon as the startup phase is finished, the
message "To init system hold <Enter>" is displayed
5. If you want to access the QCG, push and hold the
button on the Sunny Remote Control 1.
The screen to the right will appear (to learn how to
proceed further, see section 10.2 „Starting the
Quick Configuration Guide (QCG)“ (87)).
6. If you do
not
push the button within 5 seconds, the
Sunny Backup 2200 will skip the QCG and show
the following message.
7. Push and hold the button on the Sunny Remote Control 1.
During the startup process, the inverter LED on the Sunny Backup 2200 switches from yellow to
green.
8. The Sunny Remote Control 1 starts to beep.