Disregarding this information can lead to personal injury or device failure. SMA Solar Technology AG does not accept
liability for any resulting damage.
0
I
0
I
0
I
Figure 21: Internal arc pressure at the MV Power Station
4.3.7
Recesses in the Support Surface
Recesses for cable routing must be provided in the support surface. For the MV Power Station with two inverters, an
additional recess is required for the oil spill containment.
During planning of the recesses in the support surface, the positions of the support feet for the station and the service
platforms must be taken into account.
4 Information for Installation
SMA Solar Technology AG
Transportation and Installation Requirements
MVPS22JP-TA-en-20
28
Summary of Contents for MEDIUM VOLTAGE POWER STATION 1000-1SC-JP
Page 38: ...www SMA Solar com...