On-Site Services
The following provisions and services are not included in the product scope of delivery:
• Transport to the construction site (can be carried out by us on request)
• Crane for unloading the product at the construction site (can be supplied by us on request)
• Foundation for the product
• Inspection shaft for the oil drain valve
• Installation of the optional oil spill containment including oil spill containment grounding
• Protective tubes for cable entry
• External grounding system
• All mounting and connection work at the construction site
• Door locks
• Commissioning (can be carried out by us on request)
• Screws and wall plugs for the attachment of the support feet at the foundation