1.5 Overview of Installation Area
Illustration 1.4 Overview of Installation Area
PELV (Safe to touch)
2
Equipment grounding
7
Ethernet interface x 2
8
RS-485 interface (not in use)
Live Part
1
AC connection terminals
5
PV connection terminals
Other
3
Surge Protection AC
4
Surge Protection DC
6
PV load switch (optional)
Table 1.3 Overview of Installation Area
Introduction
L00410644-01_2q / Rev. date: 2014-06-02
11
1
1