6 Installation
SMA Solar Technology AG
16
MC_BOX_36-BE-en-20
Operating Manual
6.2 Preparing the Mounting Location
Figure 5: Outside base measurements and dimensions of the drill holes
Additionally required mounting material (not included in the scope of delivery):
Four suitable screw anchors to fasten the Multicluster Box
Procedure:
1. On the mounting surface, mark the position of the four drill holes for fastening the base.
2. Drill holes at the marked positions.
3. Insert the screw anchors.