Sunny Boy 2500U
Installation and Operator’s Manual
SB2500U-11:NE
-
41
-
SMA Regelsysteme GmbH
4.6 Measuring Channels and Messages
The communication supports a number of measuring channels and messages from the
Sunny Boy inverters.
The following abbreviations are used:
BFR
B
etriebs
f
ührungs
r
echner (Sequential Control System)
SRR
S
trom
r
egelungs
r
echner (Current Control System)
Measuring Channels
Vpv PV-input
voltage
Vpv-Setpoint
PV-desired input voltage of the Vpv-control
Iac
current to the grid
Vac grid
voltage
Fac grid
frequency
Pac
power fed to grid
Zac grid
impedance
Vpv-_PE
PV-voltage to earth
Ipv
current from PV-panels
E-Total energy
yield
h-Total
total operation hours
Power On
total system start ups
Serial Number
S
unny Boy
serial number
Mode operating
mode
Error
failure description for mode “disturbance“
Mode Messages
Stop
manual system stop
Offset offset
calibration of the electronics
Waiting
grid switching-on conditions are not fulfilled (yet)
Grid monitoring
checking grid (grid impedance)
MPP-Search
PV voltage is determined and set
MPP
Sunny Boy
is in MPP mode