5 Mounting
SMA Solar Technology America LLC
Installation Manual
RSS-US-IA-xx-14
16
3. Attach the Rapid Shutdown Box using suitable
washers and nuts.
4. Ensure that the Rapid Shutdown Box is securely attached.
5.3
Mounting the Rapid Shutdown Box with Mounting
Brackets
If you would like to mount the Rapid Shutdown Box on the wall or directly on the roof, proceed as
described in the following.
Additionally required mounting material (not included in the scope of delivery):
☐ The mounting material must be made of stainless steel.
☐ 4 screws suitable for the support surface (diameter: 8 mm (0.3 in))
☐ 4 washers suitable for the screws (outer diameter: 16 mm (0.6 in))
☐ Where necessary, 4 screw anchors suitable for the support surface and the screws
Procedure:
1.
CAUTION
Risk of injury due to damaged cables
There may be power cables or other supply lines (e.g. gas or water) routed in the wall.
• Ensure that no lines are laid in the wall which could be damaged when drilling holes.
2. Align the Rapid Shutdown Box horizontally and mark the positions of the drill holes through
the mounting brackets.
3. Place the Rapid Shutdown Box to one side and drill the drill holes at the positions marked.
4. Insert screw anchors into the drill holes if the support surface requires them.
ENGLISH
Summary of Contents for RSB-2S-US-10
Page 132: ...www SMA Solar com...