Wiring and Connecting the Sunny Boy
Connecting Communication Cables
SB1100U-11:SE1604
SMA America
4-19
Note:
Be sure when reinstalling the four screws that the lock
washers are installed correctly. The teeth of the washers
should face the
LID
.
5. While holding the cover in place, carefully insert the four screws with lock washers
through the holes in the cover into the threaded holes in the case and turn them in
until they are finger-tight. Be careful not to cross-thread any of the screws.
6. Verify that the cover is in the correct position and that the seal is in place between
the case and the cover.
7. Tighten the cover screws fully, and reinspect the seal to ensure that it is in the
correct position.
Summary of Contents for SB1100U
Page 1: ...Photovoltaic Grid Tied String Inverter Sunny Boy 1100U Installation Guide SOLARTECHNOLOGY...
Page 2: ......
Page 8: ...vi SMA America SB1100U 11 SE1604...
Page 12: ...Unpacking and Inspection 2 2 SMA America SB1100U 11 SE1604...
Page 44: ...Commissioning the Sunny Boy 5 6 SMA America SB1100U 11 SE1604...
Page 68: ...Displays and Messages 6 24 SMA America SB1100U 11 SE1604...
Page 72: ...Troubleshooting 7 4 SMA America SB1100U 11 SE1604...
Page 74: ......
Page 75: ......
Page 76: ......