Introduction
Installation Overview
1-2
SMA America
SB1100U-11:SE1604
When the PV system is not producing enough power to meed the demands of all the
electrical loads in the household, additional power is drawn from the utility grid to make
up the difference. When the PV system is producing more power than is consumed by
household devices, the surplus power turns the house’s power meter backwards as it
passes into the utility grid to be used by other electrical consumers, thus producing utility
credits for the power added to the utility grid.
Note:
Policies vary from one utility company to another. Consult
with a representative of the local utility company before
planning and installing a PV system.
Installation Overview
This section provides a high-level overview of the installation process so you have an
idea what to expect as you proceed through the rest of the
Installation Guide.
The installation process is broken down into the following tasks:
Section 2: Unpacking and Inspection
This section provides instructions and information for unpacking the Sunny Boy,
inspecting it for shipping damage, and if necessary, returning a damaged Sunny Boy.
Section 3: Mounting the Sunny Boy
This section includes guidelines to help you select the best mounting location, cautions
and warnings that you should follow to avoid injury and/or equipment damage, and
step-by-step instructions for mounting a Sunny Boy 1100U inverter.
Section 4: Wiring and Connecting the Sunny Boy
This section includes guidelines for selecting the correct wire sizes, cautions and
warnings that you should follow to avoid injury and/or equipment damage, and step-
by-step instructions for wiring a Sunny Boy to a PV array, household electrical circuits,
and the utility grid. Procedures are also included for connecting optional data-
communication cables to the Sunny Boy.
Section 5: Commissioning the Sunny Boy
Commissioning involves applying DC input power to the Sunny Boy, observing the LED
indicators on the cover, and resolving any problems that occur.
Section 6: Displays and Messages
This section provides tips and procedures for resolving problems that can occur during
installation.
Summary of Contents for SB1100U
Page 1: ...Photovoltaic Grid Tied String Inverter Sunny Boy 1100U Installation Guide SOLARTECHNOLOGY...
Page 2: ......
Page 8: ...vi SMA America SB1100U 11 SE1604...
Page 12: ...Unpacking and Inspection 2 2 SMA America SB1100U 11 SE1604...
Page 44: ...Commissioning the Sunny Boy 5 6 SMA America SB1100U 11 SE1604...
Page 68: ...Displays and Messages 6 24 SMA America SB1100U 11 SE1604...
Page 72: ...Troubleshooting 7 4 SMA America SB1100U 11 SE1604...
Page 74: ......
Page 75: ......
Page 76: ......