Wiring and Connecting the Sunny Boy
Sunny Boy 1100U Internal Components
4-2
SMA America
SB1100U-11:SE1604
To disconnect the Sunny Boy, first turn OFF all DC disconnects and then all AC
disconnects. After the Sunny Boy is de-energized, disconnect the wiring in the
reverse order.
WARNING: Always wait a minimum of 5 minutes for the
stored potential in the Sunny Boy to discharge completely
before opening the enclosure.
WARNING: All electrical installations must be done in
accordance with all local electrical codes and the National
Electrical Code (NEC), ANSI/NFPA 70.
WARNING: You
must not
connect the Sunny Boy to the
electrical utility grid until you have received prior
approval from the utility company. This connection must
be made only by qualified personnel.
Sunny Boy 1100U Internal Components
All of the terminals and connectors for DC input, AC output, and communications are
inside the Sunny Boy’s case. To gain access to these and other internal components, you
must remove the cover.
Opening the Sunny Boy 1100U
Remove the four M5 screws and lock washers that attach the cover to the Sunny Boy.
Place the cover, screws, and lock washers aside where they will be out of your way while
you are connecting wires and cables to the Sunny Boy.
CAUTION:
Be careful
not to misplace the screws or the lock
washers, as all four screws and lock washers are required to
ensure that the cover is grounded properly and is fully sealed to
the case. Handle the cover carefully, as even minor damage to
the cover could result in an inadequate seal between the cover
and the case, thus allowing moisture to enter the case and
damage the sensitive electronic components.
Locating Internal Components
Figure 4-1shows the internal components of the Sunny Boy 1100U. Refer to this
illustration whenever you need to locate a component to complete a step of the
installation procedure.
Summary of Contents for SB1100U
Page 1: ...Photovoltaic Grid Tied String Inverter Sunny Boy 1100U Installation Guide SOLARTECHNOLOGY...
Page 2: ......
Page 8: ...vi SMA America SB1100U 11 SE1604...
Page 12: ...Unpacking and Inspection 2 2 SMA America SB1100U 11 SE1604...
Page 44: ...Commissioning the Sunny Boy 5 6 SMA America SB1100U 11 SE1604...
Page 68: ...Displays and Messages 6 24 SMA America SB1100U 11 SE1604...
Page 72: ...Troubleshooting 7 4 SMA America SB1100U 11 SE1604...
Page 74: ......
Page 75: ......
Page 76: ......