Displays and Messages
6-12
SMA America
SB1100U-11:SE1604
Communication Options
Sunny Boy inverters are available from the factory with different communication options
installed depending upon your needs. The Sunny Boy 1100U series allows for both
internal and external metering options to be used simaltaniously. These options may also
be installed in the field by qualified technicians.
Sunny Display
The Sunny Display is a 2 line LCD display that mounts right in the lid of the inverter. It
allows easy access to important system information such as AC power out, PV voltage,
daily and total energy yield, hours of operation and inverter status.
Data Transmission
Data that is monitored and collected by the Sunny Boy can be easily transmitted to a
remote control unit or PC. This can be accomplished in one of three ways:
Powerline:
Data is sent using the electrical wiring in the building as transmission lines.
RS-232:
Data from one inverter is sent via RS-232 cable to a remote control unit or PC.
Maximum length of cable is 50’ (15 m).
RS-485:
Data from up to 50 inverters is sent via RS-485 cable to a remote control unit
or to a PC. Maximum length of cable is 4000’ (1200 m).
Sunny Data
This Windows based application has a user friendly graphical interface that allows you
to continuously acquire and evaluate the performance data from your PV system. Each
Sunny Boy inverter and the PV strings connected to them can be viewed independently
for optimal performance evaluation.
Sunny Boy Control
The Sunny Boy Control products provide continuous monitoring and data acquisition of
your PV system. In addition to the original Sunny Boy Control, you can now choose
between the economical Sunny Boy Control Light or the full featured Sunny Boy Control
Plus.
For more information and assistance in choosing the right data option for your system,
please contact SMA America or visit our web site.
Summary of Contents for SB1100U
Page 1: ...Photovoltaic Grid Tied String Inverter Sunny Boy 1100U Installation Guide SOLARTECHNOLOGY...
Page 2: ......
Page 8: ...vi SMA America SB1100U 11 SE1604...
Page 12: ...Unpacking and Inspection 2 2 SMA America SB1100U 11 SE1604...
Page 44: ...Commissioning the Sunny Boy 5 6 SMA America SB1100U 11 SE1604...
Page 68: ...Displays and Messages 6 24 SMA America SB1100U 11 SE1604...
Page 72: ...Troubleshooting 7 4 SMA America SB1100U 11 SE1604...
Page 74: ......
Page 75: ......
Page 76: ......