SB1100U-11:SE1604
SMA America
7-1
Section 7:
Troubleshooting
Our quality control program assures that each inverter is manufactured to exacting
specifications and is thoroughly tested before leaving the factory. If you encounter
difficulty with the operation of your inverter, please follow the steps below in an effort
to correct the problem.
• Check the blinking code on the lid of the Sunny Boy and compare the code with
the blinking codes in chapter 6.
• Check and record the exact "Mode" and "Error" messages on the LCD display or
other communication system if installed. Take appropriate action to correct the
issue.
• If necessary, check the DC and AC voltages at terminals inside the inverter. Be
sure to observe all of the safety precautions listed throughout this manual when
doing so, or hire a qualified professional.
• If the system problem persists, contact technical support at: 530.273.4895
Ext.101
In order to better assist you when contacting SMA America, please provide the following
information. This information is required
before
removing the inverter from service and
prior to making a warranty claim.
Summary of Contents for SB1100U
Page 1: ...Photovoltaic Grid Tied String Inverter Sunny Boy 1100U Installation Guide SOLARTECHNOLOGY...
Page 2: ......
Page 8: ...vi SMA America SB1100U 11 SE1604...
Page 12: ...Unpacking and Inspection 2 2 SMA America SB1100U 11 SE1604...
Page 44: ...Commissioning the Sunny Boy 5 6 SMA America SB1100U 11 SE1604...
Page 68: ...Displays and Messages 6 24 SMA America SB1100U 11 SE1604...
Page 72: ...Troubleshooting 7 4 SMA America SB1100U 11 SE1604...
Page 74: ......
Page 75: ......
Page 76: ......