background image

5  Contact

SMA Solar Technology AG

Service Manual for Installers

SC-UP_SCS-UP_EZE-SG-en-10

18

5

Contact

If you have technical problems with our products, please contact the SMA Service Line. The following data is required
in order to provide you with the necessary assistance:

• Device type

• Serial number

• Firmware version

• Event message

• Type of communication

• Type and number of PV modules

• Type and size of additional energy sources

• Optional equipment, e.g. communication products

• Detailed description of the problem

Deutschland

Österreich

Schweiz

SMA Solar Technology AG

Niestetal

Sunny Boy, Sunny Mini Central,
Sunny Tripower, Sunny Highpower:
+49 561 9522‑1499

Monitoring Systems, SMA EV Charger:
+49 561 9522‑2499

Hybrid Controller:
+49 561 9522-3199

Sunny Island, Sunny Boy Storage,
Sunny Backup:
+49 561 9522-399

Sunny Central, Sunny Central Storage: 
+49 561 9522-299

SMA Online Service Center:
www.SMA-Service.com

Belgien

Belgique

België

Luxemburg

Luxembourg

Nederland

SMA Benelux BVBA/SPRL

Mechelen 
+32 15 286 730

for Netherlands: +31 30 2492 000

SMA Online Service Center:
www.SMA-Service.com

Česko

Magyarország

Slovensko

SMA Service Partner TERMS a.s 
+420 387 6 85 111

SMA Online Service Center:
www.SMA-Service.com

Türkiye

SMA Service Partner DEKOM
Telekomünikasyon A. Ş 
+90 24 22430605

SMA Online Service Center:
www.SMA-Service.com

France

SMA France S.A.S.

Lyon 
+33 472 22 97 00

SMA Online Service Center:
www.SMA-Service.com

Ελλάδα

Κύπρος

SMA Service Partner AKTOR FM.

Αθήνα 
+30 210 8184550

SMA Online Service Center:
www.SMA-Service.com

España

Portugal

SMA Ibérica Tecnología Solar, S.L.U.

Barcelona 
+34 935 63 50 99

SMA Online Service Center:
www.SMA-Service.com

United Kingdom

SMA Solar UK Ltd.

Milton Keynes 
+44 1908 304899

SMA Online Service Center:
www.SMA-Service.com

Summary of Contents for SC 4000 UP

Page 1: ...MA SUNNY CENTRAL UP SC UP_SCS UP_EZE SG en 10 Version 1 0 ENGLISH Service Manual for Installers Test Instructions for the Power Generating Unit Protection Test SUNNY CENTRAL UP SUNNY CENTRAL STORAGE U...

Page 2: ...damages under any circumstances The exclusion of implied warranties may not apply in all cases under some statutes and thus the above exclusion may not apply Specifications are subject to change with...

Page 3: ...tion 5 2 Safety 6 2 1 IMPORTANT SAFETY INSTRUCTIONS 6 2 2 Personal Protective Equipment 9 3 Disconnecting and Reconnecting 11 3 1 Disconnecting the Inverter 11 3 2 Disconnecting the Medium Voltage Tra...

Page 4: ...lified persons Qualified persons must have the following skills Knowledge of how the product works and is operated Training in how to deal with the dangers and risks associated with installing repairi...

Page 5: ...10 in the field Minutes Connects several elements to be selected Select Settings Date Button Key Button or key to be selected or pressed Select Enter Placeholder for variable components e g parameter...

Page 6: ...verter wait at least 25 minutes before opening the inverter to allow the capacitors to discharge completely Wear suitable personal protective equipment of the corresponding hazard risk category for al...

Page 7: ...closed electrical operating area WARNING Danger to life from electric shock when entering the PV power plant Lethal ground currents due to damaged insulations of the PV field Lethal electric shocks ca...

Page 8: ...th or serious injury due to electric shock Disconnect the external supply voltage Do not touch the orange cables in the inside of the product These cables are used for connecting the external supply v...

Page 9: ...e disconnected from voltage sources perform a thorough 24 month maintenance check that is not subject to the maintenance schedule After a dust or snow storm ensure that the air inlets and outlets are...

Page 10: ...foration proof soles and steel toe caps Tight fitting work clothes made of 100 cotton Suitable work pants Proper hearing protection Safety gloves Proper head protection Any other prescribed protective...

Page 11: ...of PV voltage present DC to PE 10 of PV voltage present DC to PE 0 V Additionally required material not included in the scope of delivery 2 padlocks Diameter of the shackle 5 mm to 8 mm Procedure 1 O...

Page 12: ...9 Measure the DC voltage at the terminal X251 Measure DC against DC and both poles against the grounding conductor The DC voltage must be 0 V 20 Open the hatch on the DC side of the inverter Opening a...

Page 13: ...and the Do not operate magnetic sign varistor 3 Remove the padlock from the circuit breaker for the MV switchgear 4 Open the grounding switch at the transformer panel of the MV switchgear 5 Close the...

Page 14: ...work on the product Do not touch any live components Observe all warning messages on the product and in the documentation Observe all safety information of the module manufacturer After switching off...

Page 15: ...ers Set value disconnection time Voltage increase protection 1st level V tV VCtl Hi1Lim VCtl Hi1LimTm 2nd level V tV VCtl Hi2Lim VCtl Hi2LimTm 3rd level V tV VCtl Hi3Lim VCtl Hi3LimTm 4th level V tV V...

Page 16: ...onnect the binary input of the testing device to the measurement inputs P4 and P5 on the measurement and disconnect terminals of the voltage measurement unit 4 Connect the testing device to the extern...

Page 17: ...tV with the parameters VCtl Lo6Lim and VCtl Lo6LimTm Frequency increase protection f tV with the parameters HzCtl Hi1Lim and HzCtl Hi1LimTm Frequency drop protection f tV with the parameters HzCtl Lo1...

Page 18: ...Storage Sunny Backup 49 561 9522 399 Sunny Central Sunny Central Storage 49 561 9522 299 SMA Online Service Center www SMA Service com Belgien Belgique Belgi Luxemburg Luxembourg Nederland SMA Benelux...

Page 19: ...umvit 55 Thonglor 17 Klong ton Nua Wattana 10110 Bangkok Thailand 66 20598220 smaservice spe co th Service Partner for Utility Tirathai E S Co Ltd 516 1 Moo 4 Bangpoo Industrial Es tate Sukhumvit Road...

Page 20: ...www SMA Solar com...

Reviews: