16.3 Switching a Multicluster System On and Off
16.3.1 Activation / Startup
Switching on a multicluster system can only take place at the master of the main cluster. The extension
clusters will be started automatically after starting the main cluster. A requirement is that the DC circuit
breakers of all Sunny Islands in the extension cluster are set to "ON".
Proceed as follows:
1. Carry out steps 1 - 4 in chapter 9.1 ”Activation” (page 60) on the master of the main cluster.
☑ The extension cluster masters show the message
shown here.
2. Press and hold <ENTER> on the main cluster
master.
☑ The remaining time is shown on the display as
beams.
☑ A peep is heard. The main master is on and operating. The green LED is on.
16.3.2 Stopping and Deactivating
The Sunny Island multicluster system can only be stoopped at the master of the main cluster. Proceed
at the main cluster master as described in chapters 9.2 ”Stopping the Sunny Island (Standby)”
(page 61) and 9.3 ”Switch off” (page 62).
Starting the Multicluster System
The multicluster system is started once the main master has started. All extension clusters
follow the main master.
Occurrence of an error
If the device displays an error message unexpectedly, this error must be fixed before the
Sunny Island can be put into operation. For this purpose, refer to section
20 ”Troubleshooting” (page 184).
Summary of Contents for SI 5048
Page 2: ......
Page 10: ...Table of Contents SMA Solar Technology AG 10 SI5048 TEN093630 Technical Description...
Page 43: ...SMA Solar Technology AG Electrical Connection Technical Description SI5048 TEN093630 43...
Page 209: ......
Page 210: ......
Page 212: ...4 4PMBS 5FDIOPMPHZ XXX 4 EF...