Multicluster Operation
SMA Solar Technology AG
128
SI5048-TEN093630
Technical Description
16.2 Initial Commissioning of the Multicluster System
1. Carry out steps 1 - 3 in chapter 8.2 ”Starting the Quick Configuration Guide (QCG)”
2. At "
New System
" set the following parameters:
– Device type (master, slave 1, slave 2, slave 3)
– Voltage/frequency type (230V_50Hz, 220V_60Hz), default setting is "230V_50Hz"
– System configuration (3Phase, 1Phase 1, 1Phase 2, 1Phase 3, 1Phase 4, MC-Box), for
multicluster operation choose "MC-Box". Default setting: "1Phase 1"
– Multicluster configuration (MainCluster, ExtensionClst1, ExtensionClst2, ExtensionClst3,
ExtensionClstN), default setting is "MainCluster"
– Box type choice (MC-Box-6, MC-Box-9, MC-Box-12), preset: "MC-Box-6"
3. For the other settings proceed as described in chapter 8.2 ”Starting the Quick Configuration
Summary of Contents for SI 5048
Page 2: ......
Page 10: ...Table of Contents SMA Solar Technology AG 10 SI5048 TEN093630 Technical Description...
Page 43: ...SMA Solar Technology AG Electrical Connection Technical Description SI5048 TEN093630 43...
Page 209: ......
Page 210: ......
Page 212: ...4 4PMBS 5FDIOPMPHZ XXX 4 EF...