Initial Commissioning
SMA Solar Technology AG
58
SI5048-TEN093630
Technical Description
8.3 Commissioning the battery current sensor
If you have installed a battery current sensor in your system you must synchronize the device's internal
offset. To do this, proceed as follows:
1. Put the Sunny Island on standby, as described in chapter 9.2 ”Stopping the Sunny Island
2. Short-circuit the battery current sensor cables.
– to terminal 1
– BatCur − to terminal 1
3. Set the following parameters:
Choose the type of battery current sensor:
– "225.01 BatCurSnsTyp" (None / 50 mV / 60 mV). Only after activation of the parameter
with 50 mV or 60 mV will other parameters (02, 03 and 04 in the menu "225# Battery
Current Sensor") be shown and activated.
4. Set the nominal current for the battery current sensor (e.g., 400 A / 60 mV):
– "225.02 BatCurGain60" (for a 60 mV output)
– "225.03 BatCurGain50" (for a 50 mV output)
5. Start the self-calibration:
– set "225.04 BatCurAutoCal" to "Start"
☑ The Sunny Island conducts a self-calibration.
6. Check the offset error:
"120.06 TotBatCur" should be (close to) zero.
NOTICE!
System error due to wrong parameters being entered.
All parameter settings which could affect the operating safety of the off-grid system are
protected by the installer password.
• Only qualified personnel are permitted to set and adjust system parameters.
• Enter the password as described in section 10.5 ”Entering the installer password”
Summary of Contents for SI 5048
Page 2: ......
Page 10: ...Table of Contents SMA Solar Technology AG 10 SI5048 TEN093630 Technical Description...
Page 43: ...SMA Solar Technology AG Electrical Connection Technical Description SI5048 TEN093630 43...
Page 209: ......
Page 210: ......
Page 212: ...4 4PMBS 5FDIOPMPHZ XXX 4 EF...