9 Activation and Deactivation
9.1 Activation
1. Check the following requirements:
– correct electrical connections
– voltages and polarities
2. Switch the DC circuit breaker of the Sunny Island to the "ON" position.
☑ The display of the Sunny Island lights up.
☑ The Sunny Island initiates the startup phase.
The notifications shown here are issued. The last
notice is issued as soon as the start phase is
completed.
3. Start QCG. Press and hold down <ENTER> until the Sunny Island beeps three times.
☑ The QCG is started and the notice shown here
is displayed. Continue as in chapter
8.2 ”Starting the Quick Configuration Guide
(QCG)” (page 55).
or
Systems with several Sunny Islands
Switch the slaves on
before
the master. To do this, proceed as follows.
Parameter "250.01 AutoStr"
Even with the "250.01 AutoStr" parameter set, the Sunny Island must be manually started
after each time the device is switched on using the DC circuit breaker.
SIBFSBOOT V1.004
SI5048
@SMA 2009
01#StartMenu
Start System
Summary of Contents for SI 5048
Page 2: ......
Page 10: ...Table of Contents SMA Solar Technology AG 10 SI5048 TEN093630 Technical Description...
Page 43: ...SMA Solar Technology AG Electrical Connection Technical Description SI5048 TEN093630 43...
Page 209: ......
Page 210: ......
Page 212: ...4 4PMBS 5FDIOPMPHZ XXX 4 EF...