AC Voltage Configuration
SMA America, LLC
22
SB50US-80US-eng-IUS112633
Installation Guide
*The Sunny Boy 8000-US must not be connected to a 208 V grid.
When using corner grounded 240 V or 208 V Delta grids:
• Connect terminal L2 to the grounded phase.
*
*
*