Maintenance
SMA America, LLC
86
SB50US-80US-eng-IUS112633
Installation Guide
10.5.2 Exchanging PV String Fuses within the SMA DC Disconnect
1. Disconnect the Sunny Boy on the AC and DC sides.
2. Wait 5 minutes until the residual voltage has been drained.
3. Open the SMA DC Disconnect as described in section 6.3 ”Opening the SMA DC Disconnect”
4. Replace the fuse (1, 2, 3, or 4).
5. Close the SMA DC Disconnect as described in section 6.8 ”Closing the SMA DC Disconnect”
6. Switch the AC and DC disconnect switches back on.