Sunny Boy 2000
Technical Description
SB2000-11:EE
- 25 -
SMA Regelsysteme GmbH
Please note that a cable of:
20m length/1.5 mm² cross section already has a resistance of ca. 0.48
Ω
!
35m length/ 2.5 mm² cross section already has a resistance of ca. 0.50
Ω
!
The Sunny Boy is equipped with two PG16 sized openings on the bottom of the in-
verter for cable insertion. In most cases only one cable opening is needed for Power-
line.
Before inserting the Powerline into the device check whether it is
disconnected from the mains.
•
Insert the according PG-fastening into the case and secure it with a bolt from
inside.
•
Strip the insulation off the end of the cable and insert it into the inverter.
•
The inverter is delivered with a plug - connect this inside the inverter according
to the plug documentation.
•
Check that the plug is connected correctly and that it cannot be removed. Insert
the plug into the appropriate opening and secure it with the two screws.
•
Tighten the PG16 cable sealing.
•
Close the remaining reserve opening with a PG seal.
•
Close the inverter and tighten the 4 screws.
Don’t forget to attach the PE grounding cable (green-yellow) to the
tab connector on the lid!
•
Check the correct position of the front panel and the LEDs.