Sunny Boy 2000
Technical Description
SB2000-11:EE
- 40 -
SMA Regelsysteme GmbH
•
Re-connect the PV-panel to the inverter.
•
If the red LED is still on the inverter is damaged and has to be repaired by the
manufacturer.
If the LED is off the insulation of the inverter or the connection cabling is defec-
tive. The failure must be detected with appropriate measurements and then re-
moved (see chapter 3.3.2, ‘Connection of the PV-panels’).
•
Disconnect the inverter from the PV-panel.
•
Seal the connectors with the caps.