Installation Guide
SB2500-11:SE2006
Page 25
5.
Now screw the pressure screw into into
the threaded sleeve and tighten it.
6.
Firmly tighten the screw fitting against
the seal and in order to fasten the cable.
The AC connecting socket is now fully assembled.
If you are not going to connect up the Sunny Boy immediately, close off the socket
element using the cap supplied in the accessories kit.
If the Sunny Boy is already installed, you can now connect up the fully assembled AC
connection socket to the flange plug on the Sunny Boy. To do this, remove the
protective cap from the flange plug on the Sunny Boy. Firmly tighten the threaded
ring on the AC connecting socket to the flange plug to seal the connection and secure
it.
Do not switch the line circuit breaker on yet! The Sunny Boy 2500
may only be connected to the AC grid once the PV strings are
connected and the device is securely closed.
Pressure screw
PG16 screw fitting
Summary of Contents for SUNNY BOY 2500
Page 2: ......
Page 6: ...Table of Contents SMA Technologie AG Page 6 SB2500 11 SE2006 Installation Guide ...
Page 8: ...Foreword SMA Technologie AG Page 8 SB2500 11 SE2006 Installation Guide ...
Page 10: ...Safety information SMA Technologie AG Page 10 SB2500 11 SE2006 Installation Guide ...
Page 38: ...Replacing the varistors SMA Technologie AG Page 38 SB2500 11 SE2006 Installation Guide ...
Page 44: ...Contact SMA Technologie AG Page 44 SB2500 11 SE2006 Installation Guide ...
Page 45: ......