SMA Solar Technology AG
Installation Guide
SB50US-80US-IUS094030
15
1.4 Installation Overview
This section provides a high-level overview of the installation process so you have an idea what to
expect as you proceed through the rest of the Installation Guide.
The installation process is broken down into the following tasks:
Section 2: Unpacking and Inspection
This section provides instructions and information for unpacking the Sunny Boy and inspecting it for
shipping damage.
Section 3: AC Voltage Configuration
This section includes information on removing the cover, locating primary components within the
inverter and selecting the appropriate voltage configuration for the installation.
Section 4: Mounting
This section includes guidelines to help you select the best mounting location, suggestions to insure
optimum performance, cautions and warnings that you should follow to avoid injury and/or
equipment damage and step-by-step instructions for mounting the Sunny Boy inverter.
Section 5: Wiring the Sunny Boy
This section includes guidelines for selecting the correct wire sizes, cautions and warnings that you
should follow to avoid injury and/or equipment damage and step-by-step instructions for wiring the
Sunny Boy to a PV array, household electrical circuits and the utility grid. Procedures are also included
for connecting optional data-communication cables.
Section 6: Commissioning
Commissioning involves applying DC input power to the Sunny Boy, observing the LED and LCD
indicators on the front cover, and resolving any problems that occur.
Section 7: Displays and Messages
This section provides troubleshooting tips and procedures for resolving problems that may occur
during installation and operation.
Section 8: Troubleshooting
This section provides troubleshooting tips and procedures for resolving problems that may occur
during installation and operation.
Section 9: Maintenance
This section includes maintenance and cleaning of the Sunny Boy and cautions and warnings you
should follow to avoid injury and/or equipment damage.
Section 10: Technical Specifications
This section includes technical data for the Sunny Boy, connection diagrams and torque specifications
for the connection of cables and the screws of the Sunny Boy.