Installation requirements
SMA
Technologie AG
Page 18
SB1100LV-11:SE2006
Installation Guide
The Sunny Boy SB 1100LV is designed for operation on 220 - 240 V grids with a grid
frequency of 50 Hz. When connecting an inverter to the public grid, please adhere to
the local connection requirements of your grid operator.
Limit values for AC output
Voltage range
(complying with DIN VDE 0126-1-1)
198 V ... 253 / 260 V
a
Frequency range
(complying with DIN VDE 0126-1-1)
47.55 Hz ... 50.2 Hz
Voltage range
(extended operating range)
180 V ... 265 V
Frequency range
(extended operating range)
45.5 Hz ... 54.5 Hz
a
The Sunny Boy can feed into the public grid at a maximum output voltage of
260 V for brief periods. However, DIN VDE 0126-1-1 stipulates that the
average voltage over 10 minutes must not exceed 253 V. I.e., if the grid
voltage remains constant at 254 V, the inverter is automatically disconnected
from the grid. In this case, contact the local grid operator for assistance.
DIN VDE 0126-1-1 only applies in Germany. See chapter 8.4.3 "Country-
specific parameter settings" (Page 42) for the country-specific preset default
values of your inverter.
Summary of Contents for Sunny Boy SB 1100LV
Page 2: ......
Page 8: ...Foreword SMA Technologie AG Page 8 SB1100LV 11 SE2006 Installation Guide ...
Page 10: ...Safety instructions SMA Technologie AG Page 10 SB1100LV 11 SE2006 Installation Guide ...
Page 32: ...Installation SMA Technologie AG Page 32 SB1100LV 11 SE2006 Installation Guide ...
Page 44: ...Technical data SMA Technologie AG Page 44 SB1100LV 11 SE2006 Installation Guide ...
Page 50: ...Replacing the varistors SMA Technologie AG Page 50 SB1100LV 11 SE2006 Installation Guide ...
Page 58: ...The communications interface SMA Technologie AG Page 58 SB1100LV 11 SE2006 Installation Guide ...
Page 61: ......