5 Installation Requirements
Check that all of the requirements listed below are met before installing and
commissioning the Sunny Boy.
5.1 Installation Location Requirements
The Sunny Boy SB 2500 weighs 30 kg, the Sunny Boy SB 3000
weighs 32 kg. Take this weight into account when choosing the
installation location and method of installation.
The Sunny Boy is designed for outdoor installation and should be
installed in a place where it is not exposed to direct sunlight. An
increased ambient temperature can reduce the yield of the PV
system. Installing the unit in badly ventilated, warm indoor locations
may also reduce yield.
The Sunny Boy is designed to be mounted on a vertical wall. However, if absolutely
necessary, the Sunny Boy can be installed tilted back at a maximum angle of 45°.
Vertical installation at eye-level is preferable for an optimum energy yield and maximum
operational comfort. If installing the unit outdoors, make sure that it is not slanting
forwards.
We advise against installing the unit in a horizontal position outdoors.
The ambient temperature must not be outside the -25 °C to
+60 °C range.
30 / 32 kg
Install the inverter vertically or
tilting backward.
Never install the inverter horizontally
or so that it tilts forward.
Summary of Contents for Sunny Boy SB 2500
Page 2: ......
Page 6: ...Explanation of the Symbols Used SMA Technologie AG Page 6 SB25_30 11 SE0307 Installation Guide...
Page 10: ...Safety Instructions SMA Technologie AG Page 10 SB25_30 11 SE0307 Installation Guide...
Page 20: ...Installation Requirements SMA Technologie AG Page 20 SB25_30 11 SE0307 Installation Guide...
Page 62: ...The Communication Interface SMA Technologie AG Page 62 SB25_30 11 SE0307 Installation Guide...
Page 65: ......