Installation
SMA
Technologie AG
Page 26
SB25_30-11:SE0307
Installation Guide
Connecting the AC Output with PG13.5
To connect a cable with a maximum cross-section of 13.5 mm², proceed as follows.
1.
Press the sealing ring (1) into the cord grip (2).
2.
Now slide the pressure screw (3) over the cable
first of all, followed by the cord grip with the sealing ring (4) in it. Now slide the
threaded sleeve (5) over the cable.
3.
Now connect the individual conductors to the socket element in sequence.
- Protective earth PE (green/yellow) to the
screw terminal with the earth sign.
- Neutral conductor N (blue) to screw terminal
1.
- Live L (brown or black) to screw terminal 2.
- Terminal 3 remains unused.
4.
Make sure the wires (6) are securely
connected.
(1)
(2)
(3)
(4)
(5)
PE
N
L
(6)
Summary of Contents for Sunny Boy SB 2500
Page 2: ......
Page 6: ...Explanation of the Symbols Used SMA Technologie AG Page 6 SB25_30 11 SE0307 Installation Guide...
Page 10: ...Safety Instructions SMA Technologie AG Page 10 SB25_30 11 SE0307 Installation Guide...
Page 20: ...Installation Requirements SMA Technologie AG Page 20 SB25_30 11 SE0307 Installation Guide...
Page 62: ...The Communication Interface SMA Technologie AG Page 62 SB25_30 11 SE0307 Installation Guide...
Page 65: ......