Technical Data
SMA
Technologie AG
Page 44
SB25_30-11:SE0307
Installation Guide
Upv-Start
The DC voltage required before the inverter begins feeding
power into the grid.
This value is above the minimum MPP voltage which is required
in order to always guarantee safe connection to the grid, and to
minimize grid relay wear.
If, after disconnection from the grid, and in the absence of any
further faults, the inverter does not automatically reconnect to the
grid, this parameter can be decreased in small steps.
It must be noted that if the value is set too low, this leads to an
increased number of connections to the grid, and thus to
increased wear of components.
Usoll-Konst
PV desired voltage for constant operational voltage. These
parameters are only important when the "Betriebsart" parameter
is set to U-konst.
Name
Explanation
Summary of Contents for Sunny Boy SB 2500
Page 2: ......
Page 6: ...Explanation of the Symbols Used SMA Technologie AG Page 6 SB25_30 11 SE0307 Installation Guide...
Page 10: ...Safety Instructions SMA Technologie AG Page 10 SB25_30 11 SE0307 Installation Guide...
Page 20: ...Installation Requirements SMA Technologie AG Page 20 SB25_30 11 SE0307 Installation Guide...
Page 62: ...The Communication Interface SMA Technologie AG Page 62 SB25_30 11 SE0307 Installation Guide...
Page 65: ......