Sequence of Connecting
WARNING: Always connect the wires to the Sunny
Boy in the following sequence:
1. De-energize all AC and DC sources by switching all AC and DC disconnects
and/or breakers OFF.
2. Wiring from AC breaker to the AC disconnect switch.
3. Wiring from the AC disconnect switch to the Sunny Boy, follow the procedure
4. Wiring from the PV wires to the DC disconnect.
5. Wiring from the DC disconnect to the Sunny Boy, follow the procedure on
page 4-10 et seq..
6. Turn the DC switches and/or breakers ON.
7. Turn the AC switches and/or breakers ON.
To disconnect the Sunny Boy first turn OFF all AC disconnects and then all DC
disconnects. The AC system should always be disconnected before the DC system.
After the Sunny Boy is de-energized, disconnect the wiring in the reverse order from
above.
WARNING: Always wait a minimum of 5 minutes
for the stored potential in the Sunny Boy to dis-
charge completely before opening the enclosure.
WARNING: All electrical installations must be done
in accordance with all local electrical codes and the
National Electrical Code (NEC), ANSI/NFPA 70.
WARNING: Before connecting the Sunny Boy to the
electrical utility grid, contact the local utility compa-
ny. This connection must be made only by qualified
personnel.
Summary of Contents for Sunny Boy SB 700U
Page 1: ...Sunny Boy SB 700U Installation Guide Version 1 1 SB700U 11 SE3207 TBE SB07U...
Page 2: ...ii SMA America SB700U 11 SE3207...
Page 14: ...1 6 SMA America SB700U 11 SE3207...
Page 16: ...2 2 SMA AmericaSB700U 11 SE3207...
Page 24: ...3 8 SMA America SB700U 11 SE3207 11 Verify that the Sunny Boy 700U is firmly mounted in place...
Page 46: ...4 22 SMA America SB700U 11 SE3207...
Page 50: ...6 2 SMA America SB700U 11 SE3207 Figure 6 1 The Sunny Boy LED Status Indicator...
Page 84: ...8 6 SMA America SB700U 11 SE3207...
Page 85: ......