6  Commissioning

SMA Solar Technology AG

System Manual

SBSUL9540-SH-en-10

22

5. Select the button [

Active

].

6. Select the icon 

Create new power profile

.

7. Enter the name of the power profile in the field 

Name of the power profile

.

8. Select the entry 

Time of use

 in the drop-down list 

Operating mode of the power profile

.

9. Enter the target charging power in the field 

Forced charging power

. The power is set

independently of the grid-connection point.

10. Make the time range setting. You can select on which days of the week, in which date range

and at what time the power profile should be valid. Even a power profile independent of the
days of the week, which should be valid on a set date, can be configured. For this, you must
select the the option 

Independent of days of the week

.

11. To temporarily save the power profile and to possibly create other power profiles, select the

'save' icon to the right of the overview 

Created power profiles

. The data are saved

temporarily on this page. The data are only transferred when the page is closed by clicking on
the [

Save

] button.

12. To assign priority to multiple power profiles, select the desired power profile in the overview

Created power profiles

 and set the priority by moving the power profile up or down.

13. To save the power profile and to close the page, select [

Save

].

14. To deactivate a power profile, select the desired power profile in the overview 

Created

power profiles

 and then select the entry 

Inactive

 from the drop-down list 

Operating mode

of the power profile

.

6.3.5

Setting the Peak Load Shaving Function (optional)

Peak load shaving

With the "Peak Load Shaving" function, you can optimize the behavior of the battery inverter with
respect to the power exchange at the grid-connection point. This is mostly useful when a higher
supply of energy would lead to a higher electricity cost. With the "Peak Load Shaving" function,
certain grid-exchange power outputs to which the battery inverter is adjusted depending on its
power and battery capacity available can be set. Power peaks can thus be avoided.
You can configure times and setpoints for the power drawn at the grid-connection point. When the
loads require additional energy, the battery is discharged and the maximum value is kept constant
at the grid-connection point. This is based on the prerequisite that the battery is sufficiently charged.
At times when the "Peak Load Shaving" function is not activated, the battery is charged or
discharged correspondent to the increased self-consumption for the entire system. The "Peak Load
Shaving" function is deactivated by default and must be activated by creating power profiles.

Procedure:

1. Activate the battery inverter user interface.
2. Log in as 

Installer

.

3. Select the menu 

User settings

.

4. Select [

Power profile

].

5. Select the button [

Active

].

6. Select the icon 

Create new power profile

.

Summary of Contents for SUNNY BOY STORAGE 3.8-US

Page 1: ...SBSUL9540 SH en 10 Version 1 0 ENGLISH System Manual SMA ENERGY SYSTEM with SUNNY BOY STORAGE 3 8 US 5 0 US 6 0 US...

Page 2: ...ion of implied warranties may not apply in all cases under some statutes and thus the above exclusion may not apply Specifications are subject to change without notice Every attempt has been made to m...

Page 3: ...pairing and using electrical devices batteries and installations Training in the installation and commissioning of electrical devices and installations Knowledge of all applicable laws standards and d...

Page 4: ...of Warning Messages The following levels of warning messages may occur when handling the product DANGER Indicates a hazardous situation which if not avoided will result in death or serious injury WARN...

Page 5: ...inals X703 1 to X703 6 Enter 10 in the field Minutes Connects several elements to be selected Select Settings Date Button Key Button or key to be selected or pressed Select Enter Placeholder for varia...

Page 6: ...ps manuals sma de SB Sxx US 10 en US in dex html Approved batteries and battery commu nication connection Overview of approved batteries and cir cuitry overview of the battery communi cation connectio...

Page 7: ...1 Information on this Document SMA Solar Technology AG System Manual SBSUL9540 SH en 10 7 LG Chem RESU10H www lgchem com BYD BYD B Box H http www eft systems de us...

Page 8: ...cause personal injury or property damage 2 2 IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS This section contains safety information that must be observed at all times when working DANGER Dang...

Page 9: ...or damaged B C A Figure 1 Main system components Position Designation A Sunny Boy Storage The Sunny Boy Storage converts the direct current supplied by the battery into grid compliant alternating cur...

Page 10: ...Manual SBSUL9540 SH en 10 10 4 System Overview SMA ENERGY SYSTEM SUNNY PORTAL CUSTOMER SYSTEM SMA STORAGE SYSTEM UTILITY GRID Alternating current SMA PV SYSTEM Solar energy Communication LOADS ENERGY...

Page 11: ...CHUTZEINRICHTUNG 2x2 2x1 2 2 2 2 2 2 ENERGY METER Modbus RTU Grounding conductor line conductor L1 and L2 Neutral conductor cabel DC 600 V cabel DC 600 V LOADS PV MODULES DISTRIBUTION BOARD GRID CONNE...

Page 12: ...with LG Chem RESUxxH 1 SUNNY BOY STORAGE 6 5 4 3 2 A B C D E F LG Chem RESUxxH Clamping position Assignment Clamping position Assignment A Not assigned B Enable 3 BAT EN C GND 2 GND AUX D CAN L twist...

Page 13: ...STORAGE A B C D E F 2 4 6 8 10 BYD Battery Box H 1 3 5 7 9 2 4 6 8 10 Clamping position Assignment Clamping position Assignment A Not assigned B Enable 2 EN 11 V C GND 4 EN 11 V D CAN L twisted pair c...

Page 14: ...G System Manual SBSUL9540 SH en 10 14 4 3 Communication Overview SUNNY PORTAL SUNNY BOY SUNNY BOY STORAGE Modbus SWITCH INTERNET ROUTER Ethernet LAN Public Internet CAN BATTERY ENERGY METER Modbus RTU...

Page 15: ...s must not be exposed to direct solar irradiation and must be protected from rain water When becoming too hot the system reduces its power output to avoid overheating The system must not be installed...

Page 16: ...with MAC address binding If DHCP is not supported an IP from the address range of the router must be assigned manually to each device TCP ports 123 443 and 9524 must be authorized for outgoing connect...

Page 17: ...0 22 mm 2 x 2 x 24 AWG Shielding yes Twisted pair conductors UV resistant for outdoor use Maximum cable length 10 m 33 ft Requirements The distribution board is installed The router is installed The s...

Page 18: ...by SMA Solar Technology AG is available at www SMA Solar com 1 Install the battery as specified by the manufacturer 2 Connect the DC conductors the grounding conductor and the communication cable as...

Page 19: ...erter Switch on the AC circuit breaker All three LEDs light up The start up phase begins All three LEDs go out again after approximately 90 seconds Depending on the available power the green LED pulse...

Page 20: ...LAN networks Enter the inverter WLAN password Within the first ten feed in hours and prior to completing the configuration by means of the installation assistant you must use the standard WLAN passwor...

Page 21: ...ery types and if a green check mark appears in the overview Status 11 Select Save and next 12 Check all settings in the summary You can export the summary or all parameters Once all settings are corre...

Page 22: ...o deactivate a power profile select the desired power profile in the overview Created power profiles and then select the entry Inactive from the drop down list Operating mode of the power profile 6 3...

Page 23: ...save the power profile and to possibly create other power profiles select the save icon to the right of the overview Created power profiles The data are saved temporarily on this page The data are onl...

Page 24: ...ight Type and number of PV modules Detailed description of the problem Battery Type Firmware version Sunny Portal System name in Sunny Portal Access data for Sunny Portal United States SMA Solar Techn...

Page 25: ......

Page 26: ...www SMA Solar com...

Reviews: