Sunny Boy 1800U
Installation and Operator’s Manual
SB2500U-11:NE
-
11
-
SMA Regelsysteme GmbH
Preparing the Mounting
The Sunny Boy is mounted on its back side with the 3 metal straps. For that 3 screws
and 3 according dowels (wall anchors) are necessary. The screws and dowels are not
included. We recommend 6 mm screws and 8 mm dowels.
NOTE: For outside mounting use stainless steel screws. Use a plas-
tic washer in order to avoid scratching the paint.
Fig. 2.3:
Side view of the mounting to wall
Metal straps for mounting:
The top straps take the load, the bottom is screwed down
in order to prevent the tilting off the wall.
Mounting to wall
•
Mark the holes with the drilling template.
•
Drill the holes (and put in the wall anchors), put in the screws of
both top holes
and
screw them in until ca. 4 mm are sticking out.
•
Hang the inverter into the two top screws.
•
Fasten the bottom screw. This will prevent lifting of the inverter case.
•
Check the mounting of the inverter.