Sunny Boy 1800U
Installation and Operator’s Manual
SB2500U-11:NE
-
5
-
SMA Regelsysteme GmbH
Table of Contents
1
Introduction ............................................................................................................... 6
2
Installation................................................................................................................. 7
2.1
What Must Be Done in Case of Transport Damages?...................................... 7
2.2
Placement of the Sunny Boy ............................................................................ 8
2.3
Electric Connection ........................................................................................ 12
2.3.1
Preparation of the electric connection........................................................ 14
2.3.2
Connection to Electrical Utility Grid............................................................ 16
3
Commissioning ....................................................................................................... 20
4
Operation and Failure Indication LEDs ................................................................... 24
4.1
Operation Indicator......................................................................................... 27
4.2
Ground Fault Indicator.................................................................................... 30
4.3
Failure Indication ............................................................................................ 31
4.4
Opening and closing of the Sunny Boy .......................................................... 36
4.5
Upgrading or modification of the Sunny Boy interface.................................... 39
4.6
Measuring Channels and Messages .............................................................. 41
4.7
Measurement Precision.................................................................................. 43
5
Troubleshooting ...................................................................................................... 44
6
Warranty Regulations and Liability ......................................................................... 46
7
Technical Data........................................................................................................ 48
7.1.1
Minimum MPP-voltage of the PV panel ..................................................... 49
8
Appendix................................................................................................................. 56