Sunny Boy 1800U
Installation and Operator’s Manual
SB2500U-11:NE
-
7
-
SMA Regelsysteme GmbH
2 Installation
WARNING: Before installing the Sunny Boy, read all instructions and
cautionary markings in the technical description and on the Sunny
Boy and the photovoltaic array.
WARNING: All electrical installations shall be done in accordance
with all local electrical codes and the National Electrical Code (NEC),
ANSI/NFPA 70.
WARNING: Connecting the Sunny Boy to the electrical utility grid
must only be done after receiving prior approval from the utility
company and performed only by qualified personnel.
2.1 What Must Be Done in Case of Transport Damages?
The Sunny Boy inverters are thoroughly checked before they are shipped. Even though
they are delivered in a sturdy packaging (which can be recycled) the inverters can be
damaged which is the forwarding company’s fault in most cases.
Please inspect your inverter thoroughly after it is delivered. If any damages can be de-
tected on the packaging that could lead to the conclusion that the contents is damaged or
if you detect that the inverter is damaged please immediately notify the forwarding com-
pany.
SMA or your local supplier can help you in this matter. In any case the declaration of
transport damage must be made within 6 days upon receipt of the product and must be
stated in writing directly to the forwarding agent. If it is necessary to return the inverter to
the manufacturer please use the packaging the inverter was sent in.