Measurement channels and messages
SMA America, LLC
34
SB_CL_US-BUS094410
User Manual
VacL2-Bfr
VacL2-Srr
The grid voltage on line 2 is no longer within the permissible range ("Bfr"
or "Srr" is an internal message that has no meaning for the user). This can
be caused by any of the following:
• Grid disconnected (line circuit breaker, fuse),
• AC cable is broken or
• AC cable is highly resistive
For safety reasons, the inverter disconnects itself from the grid.
Corrective measures
• Contact your installer to check the grid voltage and the grid
connection at the inverter.
• If the grid voltage is outside the acceptable range due to local grid
conditions, your installer must ask the utility operator whether the
voltage can be adjusted at the feed-in point or whether they would
agree to modifications in the monitored operational limits (operating
parameters: Vac-Min and Vac-Max).
• If the grid frequency is within the tolerable range, yet "Vac-Bfr," or
"Vac-Srr" faults are still being displayed, contact SMA.
VdclinkMax
The internal hardware monitor has detected an overvoltage condition in
the intermediate circuit of the inverter.
Corrective measures
• Contact your installer or the SMA Serviceline if this problem recurs.
VpvMax
Overvoltage at DC input.
Corrective measures
• Contact your installer who will immediately disconnect the PV
generator from the inverter! Otherwise, the inverter may be
damaged.
• Your installer must check the DC voltage, as described in the inverter
installation guide.
Watchdog
Watchdog Srr
Internal program run fault.
Corrective measures
• Contact your installer or the SMA Serviceline if this problem recurs.
Message
Description and corrective measure
Summary of Contents for SUNNY BOY US
Page 1: ...SB_CL_US BUS094410 TBUS SBUS Version 1 0 US PV Inverter SUNNY BOY US User Manual ...
Page 2: ......
Page 38: ......
Page 39: ......
Page 40: ...4 NFSJDB XXX 4 NFSJDB DPN ...