7 Periodic Actions
SMA Solar Technology AG
Maintenance Manual
65
SCCPXT-E7-WA-en-37
2. Screw the left-hand ventilation grid on (torque: 20 Nm,-head size
T40).
3. Insert the right-hand ventilation grid.
4. Screw the right-hand ventilation grid on (torque: 20 Nm,-head
size T40).
7.2
Entering the Password via the Touch Display
Installer access
The "Installer" access level is activated by entering the installer password. The access level is reset after 15
minutes.
Procedure:
1. Select .
2. Select .
3. Confirm your entry by selecting .
☑ The symbol appears in the status info line.
7.3
Parameter Overview
7.3.1
Accessing the Parameter Overview
1. Log into the user interface as an installer.
2. Select
Data > Devices
.
3. Select the desired device from the list.
4. Select the tab
Parameters
.
Summary of Contents for SUNNY CENTRAL 1000CP XT
Page 70: ...www SMA Solar com...