SMA Solar Technology AG
Opening and Closing
Technical Description
SSMUS-TUS094511
59
10.2 Closing the Sunny Central String-Monitor
1. Reinsert the fuses into the fuse holders.
1. Close the fuse holders.
2. Close the Sunny Central String-Monitor.
3. Commission the Sunny Central as described in the
Sunny Central Installation Guide.
4. Remove the cover of the PV modules.
☑ The Sunny Central String-Monitor is closed.