Sunny Island Electrical Connection
SMA
Solar Technology AG
54
SI2012_2224-TEN082311
Technical Description
Upon delivery of a Sunny Island, the "SyncIn" socket is terminated.
-
Master (first Sunny Island):
-
A terminator is plugged into the "SyncIn" socket.
-
Insert the communication cable's RJ45 plug in the "SyncOut" socket. The plug snaps
audibly into place.
-
Lay the other end of the communication cable in the second Sunny Island.
-
Slave 1 (second Sunny Island):
-
Remove the terminator from the "SyncIn" socket.
-
Plug the RJ45 plug of the communication cable from the master device in the "SyncIn"
socket of the slave 1. The plug snaps audibly into place.
-
If
no other Sunny Island
(slave 2) is to be installed in the island grid system, plug a
terminator in the "SyncOut" socket of the slave 1. The terminator snaps audibly into
place.
-
If
a third Sunny Island
(slave 2) is to be installed in the island grid system, plug the
RJ45 plug of another communication cable in the slave 1's "SyncOut" socket. The plug
snaps audibly into place.
-
Lay the other end of the communication cable in the third Sunny Island.