(First) Commissioning
SMA
Solar Technology AG
76
SI2012_2224-TEN082311
Technical Description
9.2 Starting the Quick Configuration Guide (QCG)
The QCG is automatically activated when the device is started for the first time. Please continue
reading under point 7, otherwise follow this list.
Information
The QCG sets up all parameters values automatically. Reasonable operation is possible
this way, with little manipulation.
1.
Insert the NH fuse in the BatFuse or close the
BatFuse's DC disconnector.
2.
Start the Sunny Island.
Press the DC start key on the Sunny Island
3.
The Sunny Island initiates the startup phase. Wait
for the following displays to finish.
4.
"To init system hold <Enter>" is displayed after
the startup phase.
5.
Press and hold the pushbutton on the Sunny
Control 1.
During this procedure a bar appears on the
display.
HSI2012BFSBOOT V1.002
SI2224
@SMA 2007
To init system
hold <Enter>