No.
Name
Description
E606
Rly1Slv2On
Multifunction relay 1 of slave 2 is activated.
E609
TransferOff
Internal transfer relay is open.
E610
TransferOn
Internal transfer relay is closed.
E611
TransferSlv1Off
Internal transfer relay of slave 1 is open.
E612
TransferSlv1On
Internal transfer relay of slave 1 is closed.
E613
TransferSlv2Off
Internal transfer relay of slave 2 is open.
E614
TransferSlv2On
Internal transfer relay of slave 2 is closed.
E617
Rly2Off
Multifunction relay 2 is deactivated.
E618
Rly2On
Multifunction relay 2 is activated.
E619
Rly2Slv1Off
Multifunction relay 2 of slave 1 is deactivated.
E620
Rly2Slv1On
Multifunction relay 2 of slave 1 is activated.
E621
Rly2Slv2Off
Multifunction relay 2 of slave 2 is deactivated.
E622
Rly2Slv2On
Multifunction relay 2 of slave 2 is activated.
E625
DigInOff
No voltage at input
DigIn
(Low).
E626
DigInOn
Voltage at input
DigIn
(High).
10.4.6 System Category (7xx)
No.
Name
Description
E705
PwrOn
Device start
E706
DateSet
Date or time has been changed.
E707
NewSys
New system configured in the QCG.
E708
Fw1Update
Part 1 of the firmware updated.
E709
Fw2Update
Part 2 of the firmware updated.
E710
ClstUpdate
Cluster firmware updated.
E711
CardInsert
SD memory card is inserted.
E712
ParaUpdate
Parameter set has been loaded from SD memory card.
E715
SRCOn
Sunny Remote Control is activated.
E716
PvDiscon
Disconnection of inverters whose power is not controllable depending on the frequency
E718
NoComMod1
Communication interface 1 is incorrectly plugged or missing.
E719
NoComMod2
Communication interface 2 is incorrectly plugged or missing.
10 Troubleshooting
SMA Solar Technology AG
Operating Manual
SI30M-44M-60H-80H-BE-en-33
50
Summary of Contents for SUNNY ISLAND 3.0M
Page 163: ......
Page 164: ...www SMA Solar com...