Sunny Island 4500
Installation & Operating Instructions
BWRI45-13-EE0304
- 117 -
SMA Regelsysteme GmbH
8.6 Menu “PARGEN“ (3+6), Parameters Generator
This menu can only be selected after the installer password (level: 1) has been
entered.
In the menu “PARGEN“ (3+6) the operator can change the parameters for a con-
nected generator. Under the parameter “602_GenSet Type“ the type of starting pro-
cedure can be defined. The Sunny Island provides three different starting procedures
(see Fig. 12.1). The individual time periods within these procedures can also be set in
the menu “PARGEN“ (3+6).
Fig. 8.8:
Menu “PARGEN“ (3+6)
“PARGEN“ (3+6)
Name
Description
602_GenSet Type
None:
No generator present in island grid
Grid forming:
Generator is grid-forming.
Mains:
Sunny Island is operated on the public utility grid.
BHKW-Mains
Sunny Island is operated together with an ecopower CHP
and on the public utility grid
BHKW-Island
Sunny Island is operated together with an ecopower CHP
Mains form
Sunny Island is operated together with a grid-forming gen-
erator and on the public utility grid
fast Grid form
Generator is grid-forming and it is switched between the
generator and the Sunny Island without interruption (special
installation measures are necessary for this)
fast Mains
The Sunny Island is operated on the public utility grid and it
is possible to switch from the Sunny Island as grid-former
to the public utility grid without interruption. (special installa-