12 Terminal Diagrams for Generator Options
For simple and fast installation you can see on the following pages examples for wir-
ing to connect a generator to an island system. The examples are based on single-
phase island systems. In principle the same installation measures have to be per-
formed when erecting a three-phase island system. Three-phase options are not
shown here so as not to confuse the reader.
12.1 Stationary Generators
Generator
Status
Typ 1
Operate
Grid
Off
Glow
Crank
Warm
Run
Cool
Stop
Lock / Fail / Dead
;;
;;
Typ 2
Ignition
Grid
Crank
;;
;;
;;
;;
Typ 3
Glow / Stop
Grid
Crank
;;
;;
K 1
K 2
K 6
K 1
K 2
K 6
K 1
K 2
on
off
on
off
on
off
on
off
on
off
on
off
on
off
on
off
*
*
Fig. 12.1:
Starting phase sequence for different generator types
* depending on the firmware version, other relays are used for this feature (see Table 8.5)