Sunny Island 4500
Installation & Operating Instructions
BWRI45-13-EE0304
- 17 -
SMA Regelsysteme GmbH
The state of charge of the batteries can therefore only be manipulated by controlling
the power generating components and the consumers within the grid.
Due to the battery management, the Sunny Island can perform a full charge of high
quality even in this operating mode. This might take several days, if necessary (for
example if there are only photovoltaic feeders).