Sunny Island 4500
Installation & Operating Instructions
BWRI45-13-EE0304
- 215 -
SMA Regelsysteme GmbH
Name Unit
Min.
Max.
Default
Description
Uchrg act
V
0
200
0
Setpoint value of battery voltage
Ibat mean
A
-150
150
0
Mean value of battery current
Ibat Sum
A
-320
320
0
Sum of battery current SI (three phases)
Tbat mean
degC
-25
125
0
Battery temperature mean value
Pbat mean
W
-32000 32000
0
Battery power mean value
Pbat Sum
W
-32000 32000
0
Sum of battery power SI (three phases)
SOC RSK
%
-100
110
50
State of charge of module for open-circuit voltage
calibration
SOC diff RSK
%
0
100
50
Error SOC for open-circuit voltage calibration
Cbat act
Ah
50
10000
100
Current capacity
Qdn full
Ah/
100Ah
-10000 10000
0
Charge throughput (discharge) since last full
charge
Qdn equal
Ah/
100Ah
-10000 10000
0
Charge throughput (discharge) since last equaliz-
ing charge
tpast full
d
0
3700
0
Time since last full charge
tpast equal
d
0
3700
0
Time since last equalizing charge
t Uconst chg
h
0
10
0
Time of constant U phase for normal charges
t Uconst full
h
0
20
0
Time of constant U phase for full charges
t Uconst equal
h
0
40
0
Time of constant U phase for equalizing charges
ChargeOper
0
5
1
State of battery management (charging method)
1: none
(required charge voltage for
battery management)
2: normal
(normal charge)
3: full
(full charge)
4: float
(float charge)
5: equalize
(equalizing charge)
SOC AHB
%
0
0
State of charge for full charge calibration
Name Unit
Min.
Max.
Default
Description
“DATGRD“ (1+4)
Uconv eff
V
0
500
0
Current grid voltage actual value
Fconv
Hz
0
100
0
Current grid frequency
Iconv eff
A
0
320
0
Averaged grid current
Iconv Sum
A
0
640
0
Inverter current (three phases)
Pconv
W
-32000 32000
0
Grid active power Sunny Island
Pconv Sum
kW
-320
320
0
Sum of grid active power SI (three phases)
Qconv
var
-32000 32000
0
Grid reactive power SI
Qconv Sum
kvar
-320
320
0
Sum of grid reactive power SI (three phases)