Sunny Island 4500
Installation & Operating Instructions
BWRI45-13-EE0304
- 87 -
SMA Regelsysteme GmbH
Parameter Default
Description
1Phs_Slv3:
single-phase parallel peroration with three de-
vices with one single battery pack, device is
slave 3
3Phs_Mstr1Set: three-phase operation, device is master (L1)
3Phs_parallel: three-phase operation in droop-mode (see
Chapter 11.7.2 and 11.7.3), device is master
(L1)
3Phs_Slv1L2:
three-phase operation, device is slave (L2)
3Phs_Slv1L3:
three-phase operation, device is slave (L3)
647_ClustMode
Off
Off:
No special funcion is assigned to this Sunny
Island
SupMstr:
Sunny Island is the “Super Master” that is in
charge of controlling the other clusters in the
system and the generator, where applicable.
ClstMstr:
Sunny Island is the Master of a secondary
cluster in the system that is contolled by a
“Super Master”
Reptr:
Sunny Island is the Slave to which COM2 port
another cluster is connected??
501_Cbatnom
350 Ah
Nominal capacity of the battery of 10 hours. This always has to
be entered as defined in the manufacturer’s instructions even if
the battery has already aged!
In case that the manufacturer did not specify a capacity of 10
hours select the specification that is nearest to the capacity of 10
hours.
502_Bat Type
Lead acid
Lead storage battery with...
Lead acid:
... liquid electrolyte
Fleece:
... electrolyte bound in fleece
Gel:
... electrolyte bound in gel
503_Ubat nom
60.0 V
Nominal battery voltage.
504_Ubat min
51
min. battery voltage permissible
505_Ubat max
84
max. battery voltage permissible
506_acid density
1.24 kg/l
Nominal acid density of electrolyte, should be entered as defined
in the manufacturer’s instructions to accelerate its adaptive de-
termination by the Sunny Island.
509_Tbat max
40
Maximum battery temperature permissible
511_Bat Fan
Not installed
Battery room fan installed (only for lead storage battery with liq-
uid electrolyte)
Not installed
Installed