Sunny Island 4500
Installation & Operating Instructions
BWRI45-13-EE0304
- 97 -
SMA Regelsysteme GmbH
Please check now referring to Chapters 8 and 16 whether additional settings for
adaptation to the island grid are required or reasonable.
It is strongly recommended to leave all loads in the system switched off
until the battery state reaches N1 for the first time (the battery state
(BAZ) is displayed in various menus, see Chapter 9 for details).